Case Studies

Back to Case Studies

Commercial Plant Room Upgrade

With 20-year-old mechanical plant, this client was in urgent need of an upgrade before it completely failed on them.

Alongside our trusted contractors, we installed the following:

  • 4no. Ideal Evomax Boilers on a cascade system
  • 1no. AO Smith Direct Fired Hot Water Cylinder
  • Complete New Flue System
  • Dirt & Air Separator
  • Pressurisation Unit
  • Control System Alterations

The site now future proof for the next 20 years and beyond…

  • Location

    Milton Keynes

  • Services

    Upgrade